PEUGEOT Partner Tepee 1.2 PureTech Allure / Trekhaak /

Year 2018
Mileage 119.019
Fueltype Benzine
Cilinder volume 1199 cc
Power 81 kW / 110 PK
Transmission Handgeschakeld
Bodytype MPV
Euro class Unknown
Curb mass Unknown
VAT/Margin Marge
Rest bpm € 1.320,-

Options and accessories i

No rights can be derived from the description of options and accessories below. The options shown are based on an external data source. It is important that you conduct thorough research on the type, model, and associated options yourself. Do not forget to carefully examine the photos as well. Should you have any questions or doubts, please feel free to contact us. We are ready to assist you with your inquiries.

Achterbank in delen neerklapbaar, Achterklep, Achterstoelen drie, Achteruitrijcamera, Airbag(s) side voor, Airbag bestuurder, Airbag passagier, Anti Blokkeer Systeem (ABS), Autotelefoonvoorbereiding met Bluetooth, Bandenspanningscontrolesysteem, Bestuurdersstoel in hoogte verstelbaar, Boordcomputer, Buitenspiegels elektrisch verstelbaar, Buitenspiegels in carrosseriekleur, Buitenspiegels inklapbaar, Buitenspiegels verwarmbaar, Bumpers in carrosseriekleur, Centrale deurvergrendeling met afstandsbediening, Cruise control, Dakrails, Dimlichten automatisch, Electronic Stability Program (ESP), Electronic climate controle, Elektrische ramen voor, Extra getint glas, LED dagrijverlichting, Lederen stuurwiel, Metallic lak, Mistlampen adaptief, Navigatiesysteem, Parkeersensor achter, Parkeersensor voor, Radio-CD/MP3 speler, Regensensor, Startblokkering, Stuur verstelbaar, Trekhaak, Zijschuifdeur links, Zijschuifdeur rechts


General

Registration XD834R
Make Peugeot
Model Partner Tepee
Driving V

History

Mileage 119019
Year 2018
Date first admission (Netherlands) 08-12-2018
Import Ja
Date APK 02-07-2026

Financial

BPM € 4.045,-
Rest BPM € 1.320,-
Rest bpm refund possible Ja

Body

Color grijs
Number of doors 5
Number of seats 5

Engine and performance

Number of cilinders 3
Cilinder volume 1199 cm2
Power (kW) 81
Power (pk) 110.16
LPG G3 false

Rating


Download app