MERCEDES-BENZ V-klasse 300d Extra Lang Avantgarde Memorie verwarmd gekoeld Adaptieve cruise 360 Camera Nieuwstaat

Year 2024
Mileage 9.885 NAP checked
Fueltype Diesel
Cilinder volume 1950 cc
Power 174 kW / 237 PK
Transmission Automaat
Bodytype Bedrijfswagen
Euro class Unknown
CO2-emission combined Unknown
Curb mass Unknown
VAT/Margin BTW
Rest bpm No

Options and accessories i

No rights can be derived from the description of options and accessories below. The options shown are based on an external data source. It is important that you conduct thorough research on the type, model, and associated options yourself. Do not forget to carefully examine the photos as well. Should you have any questions or doubts, please feel free to contact us. We are ready to assist you with your inquiries.

AMG-styling, AMG Sport-pakket, Achterruit apart te openen, Achterspoiler, Achteruitrijcamera, Adaptief Demping Systeem (ADS), Airbag(s) hoofd achter, Airbag(s) hoofd voor, Airbag(s) side voor, Airbag bestuurder, Airbag passagier, Airco automatisch, Android Auto, Anti Blokkeer Systeem (ABS), Apple carplay, Armsteun voor, Audio installatie premium, Autotelefoonvoorbereiding met Bluetooth, Avantgarde Interieur, Bandenspanningscontrolesysteem, Binnenspiegel automatisch dimmend, Boordcomputer, Brake Assist System, Buitenspiegel(s) automatisch dimmend, Buitenspiegels elektrisch inklapbaar, Buitenspiegels elektrisch verstelbaar, Buitenspiegels in carrosseriekleur, Buitenspiegels verwarmbaar, Buitentemperatuurmeter, Bumpers in carrosseriekleur, Carbonafwerking interieur, Centrale deurvergrendeling met afstandsbediening, Chroom delen exterieur, Comfortstoel(en), Cruise control, Cruise control adaptief, DAB-ontvanger, Dakrails, Dakspoiler, Dimlichten automatisch, Dodehoek detector, Edition-pakket, Electronic Brake Distribution (EBD), Electronic Stability Program (ESP), Elektrisch bedienbare achterklep, Elektrische ramen voor, Elektrische schuifdeur, Elektrisch verstelbare voorstoel(en), Extra getint glas, Grootlicht-assistent, Houtafwerking interieur, Koplampen adaptief, LED koplampen, Lederen bekleding, Lederen stuurwiel, Lederen versnellingspook, Lendesteunen (verstelbaar), Lichtmetalen velgen 19", Luxe lederen bekleding, Metallic lak, Multimedia-voorbereiding, Navigatie full map, Parkeer-assistent, Regensensor, Rijstrooksensor, Rondomzicht camera, Side skirts, Sportonderstel, Startblokkering, Stoel ventilatie voor, Stuurwiel multifunctioneel, Telefoonintegratie premium, Trekhaak 'optioneel', Vermoeidheids herkenning, Verwarmde voorstoelen, Warmtewerend glas, Zijschuifdeur links, Zijschuifdeur rechts, zijwind assistent


General

Registration V72DBP
VIN number W1VVNLEZ1P4******
Make Mercedes-Benz
Model V-Klasse
Driving A

History

Mileage 9885
Year 2024
Date first admission (Netherlands) 14-01-2024
Import Nee
Date APK 14-01-2027

Financial

BPM € 33.254,-

Body

Color zwart
Number of doors 4
Number of seats 5

Engine and performance

Number of cilinders 4
Cilinder volume 1950 cm2
Power (kW) 174
Power (pk) 236.64
LPG G3 false

Rating


Download app