SEAT LEON 2.8 V6 Topsport 4

Margin
Online since: 26-11-2025 21:44
Year 2003
Mileage 293.464 NAP checked
Fueltype Benzine
Cilinder volume 2792 cc
Power 150 kW / 204 PK
Transmission Handgeschakeld
Bodytype Hatchback
Euro class Unknown
Curb mass Unknown
VAT/Margin Marge
Rest bpm No

To place a bid you have to register

FREE REGISTRATION!

Or login

Options and accessories i

No rights can be derived from the description of options and accessories below. The options shown are based on an external data source. It is important that you conduct thorough research on the type, model, and associated options yourself. Do not forget to carefully examine the photos as well. Should you have any questions or doubts, please feel free to contact us. We are ready to assist you with your inquiries.

"Lichtmetalen velgen 17""", Achterbank in delen neerklapbaar, Achterspoiler, Airbag(s) side voor, Airbag bestuurder, Airbag passagier, Alarmsysteem, Anti Blokkeer Systeem (ABS), Armsteun, Audioinstallatie met CD-speler, Bekerhouders, Bestuurdersstoel in hoogte verstelbaar, Bluetooth radio, Boordcomputer, Buitenspiegels in carrosseriekleur, Buitenspiegels van binnenuit verstelbaar, Bumpers in carrosseriekleur, Centrale deurvergrendeling met afstandsbediening, Climate control, Electronic Brake Distribution (EBD), Electronic climate controle, Elektrische ramen achter, Elektrische ramen voor, Getint glas, Hoofdsteunen achter, Middenarmsteun voor, Spoiler, Sportdemper, Sportonderstel, Sportstoelen, Startblokkering, Stuurbekrachtiging, Stuur verstelbaar


General

Registration 69LSLH
VIN number VSSZZZ1MZ3R******
Make SEAT
Model Leon
Driving V+A

History

Mileage 293464
Year 2003
Date first admission (Netherlands) 25-04-2003
Import Nee
Date APK 22-01-2026
For this car we have a MOT surcharge of € 165,-.
Read the T&C for more information

Financial

BPM € 7.243,-

Body

Color grijs
Number of doors 5
Number of seats 5

Engine and performance

Number of cilinders 6
Cilinder volume 2792 cm2
Power (kW) 150
Power (pk) 204
LPG G3 false

Rating


Download app